| Pavement Management Plan (0) 
PCI (1)
Sewer Projects (2)
|   | 2015, Completed |  
|   | 2016, Completed |  
|   | 2017, Completed |  
|   | 2018, Completed |  
|   | 2018, In - Progress |  
|   | 2019, Proposed |  
|   | 2019, Completed |  
Sewer Mains (3)
|   | Recently Repaired |  
|   | Low Priority |  
|   | Re-Inspect in 5 years |  
|   | Unable to Inspect |  
|   | Red Flag |  
|   | Urgent |  
Structures (4)
|   | Cast Iron Pipe |  
|   | Concrete |  
|   | Cured In Place Pipe |  
|   | Poly Vinyl Chloride |  
|   | Vitrified Clay Pipe |  
Fittings (5)
Manholes (6)
|   | Diversion Vault |  
|   | Flow Meter |  
|   | Valve Vault |  
|   | Vent Structure |  
Clean Out (7)
|   | Manhole |  
|   | Abandoned |  
System Valve (8)
|   | Cleanout |  
Pump Station (9)
Utility Underground Districts (10)
|   | Gate Valve |  
Overhead Utilities Structure (11)
|   | 1A (Stratford Ct. South) |  
|   | 1XA (Crest Canyon) |  
|   | 1B |  
|   | 2 |  
|   | 3 |  
|   | 4 |  
|   | 5 |  
|   | Fairgrounds (Not A Part) |  
Overhead Structures 1A (12)
Overhead Structures X1A (13)
Overhead Structures 1B (14)
Overhead Structures 2 (15)
Overhead Structures 3 (16)
Overhead Structures 4 (17)
Overhead Structures 5 (18)
Overhead Structures Fairgrounds (19)
Overhead Structures Unassigned (20)
Overhead Utilities Pole Line (21)
|   | 1A |  
|   | X1A |  
|   | 1B |  
|   | 2 |  
|   | 3 |  
|   | 4 |  
|   | 5 |  
|   | Fairgrounds |  
|   | Unassigned |  
Overhead Pole Lines 1A (22)
Overhead Pole Lines X1A (23)
Overhead Pole Lines 1B (24)
Overhead Pole Lines 2 (25)
Overhead Pole Lines 3 (26)
Overhead Pole Lines 4 (27)
Overhead Pole Lines 5 (28)
Overhead Pole Lines Fairgrounds (29)
Overhead Pole Lines Unassigned (30)
Rule 20A Blocks (31)
Del Mar City Boundary (32)
|   | 1A |  
|   | X1A |  
|   | 1B |  
|   | 2 |  
|   | 3 |  
|   | 4 |  
|   | 5 |  
|   | Fairgrounds |  
|   | Unassigned |  |